ATLANTECH LUX
AND LUX ONE BOX

INSTALLATION MANUAL




      WWW.ATLANTECH.IT


Thank you for choosing one of our products. To install this foundation de-
vice correctly and safely, please read this manual carefully. The manual is
divided into sections giving you a step -by-step guide to installation.



            STEP 1

ACTIVITY:

- Realization of the hole or the exca-
vation, to housing the upper box of
the Atlantech Lux foundation, to run
in the first case by hydraulic auger
and bits, in the second by excavator
bucket.
The depth of the hole or of the exca-
vation must be equal to the height of
the box, so that the bottom of the
box rests on the bottom of the pre-
drilled hole / excavation. On rock the
pre-holes are drilled using rotary
drilling equipment

MEANS AND ACCESSORIES:

- Excavator, we recommend starting
from 1,500 kg

- Hydraulic auger, we recommend
with max torque starting from 1.3-1.5
KNm

- Auger bits to be hooked to the hy-
draulic auger with a diameter suitable
for housing the box of the foundation
Atlantech Lux.
The tip must be chosen depending on
the type of soil (agricultural, mixed,
rocks / road massifs)

- Excavator bucket


            STEP 2

ACTIVITY:

- Positioning and infixing of the Atlan-
tech Lux foundation into the pre-
drilling or excavation work carried out
in section 1. The screwing is made
through the use of an Atlantech in-
stallation plate hooked to the auger
and up to the design / zero level at
complete support of the box on the
bottom of the hole / excavation.
- Once the screwing is complete, the
installation plate is removed and the
foundation is immediately available
for the insertion of the corrugated
and for the installation of the lighting
pole.




MEANS AND ACCESSORIES:

- Excavator, we recommend starting
from 1,500 kg

- Hydraulic auger, we recommend
with max torque starting from 1.3-1.5
KNm

- Atlantech Lux or ONE-BOX installer.
The installer can be adapted to the
auger by coupling (nuts/bolts) with a
"female" counterplate.


             SECTION 3

ACTIVITY:

- ONLY FOR LUX MODELS: Installation
of the cast iron frame of the manhole
cover on the Atlantech Lux box with
the possibility of fixing it using nuts
and bolts.
- Insertion of the corrugated into the
appropriate side holes and complete
re-filling of the corrugated track and
any empty spaces left around the box.
- ONLY FOR LUX MODELS: fixing the
grounding bolt in the appropriate
hole positioned in the center of the
internal calendered sheet.
If the lighting pole is not earthed, the
connection is not carried out.



MEANS AND ACCESSORIES:

- ONLY FOR LUX MODELS: Atlantech
Lux cast iron frame

- Nuts and bolts M8


            SECTION 4

ACTIVITY:

- ONLY FOR LUX MODELS: installation of the
lighting pole inside the foundation with the
passage of a corrugated piece between the
pole slot and the internal hole of the box.
- ONLY FOR THE LUX ONE-BOX MODELS: in-
stallation of the lighting pole inside the box,
with the passage of a corrugated piece
between the slot of the pole and the hole
positioned on the sides of the box.
- Leveling with use of crushed stone / sand
and final seal (5 / 10cm) with mortar or har-
dening resins.
- Realization of traditional electrical connec-
tions.
- ONLY FOR LUX MODELS: closure of the box
with a special spheroidal cast iron cover.



MEANS AND ACCESSORIES:

- Suitable means for the installation of the
lighting pole
- Crushed stone or sand
- Atlantech Lux cast iron manhole cover ca-


TECHNICAL NOTES FOR INSTALLERS

- The Atlantech box must, under all circumstances, be buried for at least half of its height
(for example in the ATLUX Heavy, Medium and Small Plus models the height of the upper
box is 80cm, the buried part must be at least 40cm).

- Any voids present around the box at the end of the installation must be filled, depend-
ing on their size, using landfill material, or sand, or well -compacted crushed stone, or hy-
draulic lime, in order to guarantee optimal adhesion of the ground to the foundation.

- In the case of difficulty in drilling into soils with presence of aggregates / pebbles or
rocks, a pre-drilled hole using a 10 cm diameter widia tip must be made also for the screw
foundation part.

- For the SAVE passive safety range, according to the UNI EN 12767 standard, if the foun-
dation is installed on cemented / asphalted / rocky surfaces, it will be necessary to pro-
ceed with a pre-drilled hole, in order to leave a space of at least 10cm all around the At-
lantech Lux box. After the foundation's infixing, the remaining space must be filled using
mixed sands and for the 30% crushed demolition (7cm sieve), and levelled.


 CONTROL AND MAINTENANCE

 The maintenance activities aimed at the Atlantech Lux screw foundations, fi-
 xed in the ground, can be traced back to the control of the general state, i.e.
 the restoration of the anti -corrosion protections, the verification of the pre-
 sence of any lacerations or structural failures, such as misalignments of the
 foundation, which could require restoration, to be carried out by removal and
 re-installation or by replacement in case of wear or damage.

 INDUSTRIAL PROPERTY

 The Atlantech Lux foundations are protected by proprietary know -how,
 through patents referable to international patents WO/2013/102889 -
 EP/2800835.




Atlantech S.r.l.

Viale del Lavoro, 8

37060 Bonferraro di Sorgà (VR)

Website: www.atlantech.it